Last month we finally got back to work on the new shop.  And we made some really great progress.  So much that I've got some pictures for you to look at - https://borderlands-books.blogspot.com/p/haight-st-photos.html.  The high points are:

The sheet rock is mostly complete.  There are still some small areas that I'll be completing (because they're tricky) but the crew from Pat Trainor Drywall <https://www.marinbuilders.com/list/member/pat-trainor-drywall-inc-736> came by and banged it out faster than I would have thought possible.  They are the same company that did the work at the cafe and they're just the best.  It took them only one day to hang the entire 1400 square foot ceiling plus 300 square feet of wall.  And then just two more days to do all the mud. The difference is like night and day.

Tile is also mostly complete.  Simon Firth of Canterbury Tile, who set the tile for the bathroom, did the work for the front wall and about half of the vestibule.  We changed the design partway through and so we needed more red tiles than we had on hand.  Once we finalize the design for the entry floor, he'll be back and we'll get the job finished off.  It looks so good. Even moreso, it's especially exciting because it's the first piece of final and finished work on the exterior.

And, finally, we have a mural.  Paint The Void <https://paintthevoid.org> is a cooperative effort on the part of two non-profits whose goal is, "Helping keep artists engaged and paid as guardians of hope and beauty in the wake of COVID-19".  Basically they raise funds to pay local artists to paint murals on boarded-up storefronts around town.  My friend Aaron referred me to them and, despite telling them that it was a construction site rather than someplace boarded up because of the shelter-in-place order, they said they would love to get us a mural.  A few days later I met up with Eli The Man <https://elitheman.com> who did the coolest damn thing on the front of the shop.  I think it's kind of a shame that it's temporary but, who knows, perhaps we'll figure out something neat to do, once the plywood comes down and we have windows?

This month my plan is to get the final work done on the walls in the bathroom and then I'll get the plumbers back in to finish off that job.  Beyond that, there's a tiny bit of framing in the ceiling right outside the door, followed by sheetrock and then the bathroom is done.  We'll see how getting that work done goes, with everything else that's going on.  Wish me luck!